Facts and figures on BHS Global Logistics

Office building

Organization / company

  • Employees: approx. 80
  • Corporate form: GmbH
  • Portfolio: logistics products & services 

Competence partner of BHS Corrugated Maschinen- und Anlagenbau GmbH

Logistics center

  • Logistics center: approx. 26.500 m2 floor area measuring 229 meters long x 109 meters wide x 12,41 meters high 
  • Office building: approx. 865 m2 floor area (3 floors)
  • Outdoor area: approx. 59.500 m2, with 12.000 m2 paved area
  • Investment volume: 38 million EUR

This building is one of the first industrial buildings to meet the requirements of the new BEG energy standard (BEG 55) and is already DGNB climate-certified.

View into high rack
Automated small parts warehouse
  • 34.320 container storage locations
  • 3 stacker cranes
  • 4 goods receipt / repacking stations
  • 3 picking stations (incl. Pick-by-Robot)
  • 8 packing stations
Manual cantilever warehouse
  •  
  • 6 lanes 
  • 7.000 running meter rack capacity
  •  
Manual pallet warehouse
  • 14 lanes
  • 7.908 storage places
Nov 26, 2019

Amendment of the land use plan

June 30, 2020

Preparation of the fine concept

June 17, 2021

Submission of the building application

August 2021

Start of the construction phase

September 23, 2021

Official groundbreaking ceremony

October 2022

"Cut Over Doing" and testing phase of the logistics center

Nov 30, 2022

Completion of the construction project

3rd quarter 2023

"Go-Live"

Location sketch BHS Global Logistics
Location sketch BHS Global Logistics (map material via OpenStreetMap.org)

Location / Site

Address: BHS Global Logistics GmbH, Logistikpark 1, 92729 Weiherhammer (Germany)

  • total area of the property: 17.6 ha (logistics center on a partial area of 5.8 ha)
  • 1,4 kilometers from headquarters BHS Corrugated
  • ideal road connection (A93 in the immediate vicinity, connected via district road NEW 21 to state road 2238 with direct connection to A93; also connection via state road 2966 with federal road 29 – transition to B470, which is connected to A9)
  • very good rail connection (connected to the Deutsche Bahn network via a switch; Weiherhammer at kilometer 42.1 of the non-electrified line 5060; close to the train station Weiden i.d.OPF., approx. 10 km away).
  • utilization potential of so called »combined transport«